Tolu Odunlami, MBA, PMP, PSP (832)
865 3995; itztolu@gmail.com
A
dynamic and result oriented Cost Engineer / Scheduler with over 10
years functional experience in the areas of Cost Engineering,
Scheduling, Estimating and Project Controls for Oil and Gas and
Construction projects. Proficiency in Cost Engineering Principles and
methodology, including;
- Production
chain analysis to promote cost efficiencies -
Ability to work under minimal supervision and effectively manage
multiple/changing priorities. Education: -Master of Business Administration (MBA) with concentration in
Project Management Continuing
Education / Management Certifications -Scheduling Professional (PMI-SP) -Cost Engineering (CCP)
Ongoing PROFESSIONAL EXPERIENCE XCEL
ENERGY
Dec 2015 – Present Senior Project Controller * Coordinates with Project Managers and with weekly and
monthly schedule and cost reports. * Support Project Management team in providing accurate
forecasting and review of expenditure * Communicate with various stakeholders for schedule
development * Analyze work flow for outages for plants powered by
coal, natural gas, nuclear and wind power generation * Schedule inspections and track cost of work packages
relative to budget. SADARA (SAUDI ARAMCO / DOW
CHEMICAL)
May 2015 – June 2015 Project Management / Scheduling Consultant *
Developed and revised training material to facilitate seminar *
Instructed the project management team and administrators on the use of P6
and Microsoft Project *
Trained team on the use of EVMs including CPI, SPI and variances for project
monitoring MICHAEL
OPARA
UNIVERSITY
Mar 2015 Project
Management Consultant * Developed training material for a management seminar; Project
Management as a Tool for Leadership *
Co-facilitated presentation on Project Evaluation using CPI, SPI, Baselines,
Resource Levelling and other standard methods. CHENIERE
ENERGY
Jan 2015 – Feb 2015 Project Controller Mid-Stream Projects: Creole Trail Pipeline Expansion Project, La Sabine Pass Liquefaction Project, La *
Created and Modified Project Schedule in Primavera and MS Project *
Worked to develop standardization of project controls evaluations using SPI
and CPI and other EVM measurements *
Advised project management of schedule and cost trends, critical
path changes, opportunities, conflicts and risks *
Conducted meeting with various contractors involved with the pipeline
construction project to determine deliverables and timelines and perform pipeline
estimates. *
Integrated various field contractor schedules, including; electrical, power
systems, civil and structural engineering and construction schedules and
developed Integrated Master Schedule. * Performed critical path analysis evaluations and
outlined critical milestones *
Developed daily executive summary reports describing work done,
outlining future work and commitments and identifying risk events and
determine schedule and project impacts. CDI CORPORATION Cost Engineer / Master
Scheduler
Nov 2013 – Dec 2014 Mid-Stream Projects; Kinder Morgan Export Terminal – Pasadena, Tx Chevron – Pasadena, Tx Chemical Facilities Projects: Shell – Deer Park, Tx Solvay - Pasadena, Tx * Implementing,
administering and maintaining cost control system and procedures to track
project budgets, commitments, expenditures and forecasts for projects for
major capital projects and value. *
Estimating and contract evaluation for bids and business development *
Lead Integrated Planning Sessions to clarify project deliverables and
chart work flow *
Determined Schedule Performance Indexes as a means to track project
performance *
Developed Integrated Master Schedules for project portfolios and
created baselines TEXAS SOUTHERN
UNIVERSITY
Oct 2013 Panelist *Participated in
discussion and advised faculty and student body on; Skills Required by
Corporate American and Ways to Develop them in the Classroom
NATIONAL OILWELL
VARCO
May 2011 –
Nov 2013 Drilling Projects BP, KFels, Transocean,
Samsung, Noble Drilling, Pacific Drilling, Lamprell, Atlas, Seawolf, Shanghai
Waigaiqiao, Daewoo, Jurong. * Monitored
and analyzed cost through design and construction * Schedule
and cost estimates for man power planning for SPI and CPI reporting *
Transition and recreation of
schedules and templates from Microsoft Projects to Primavera BINT AND PRATHEL
LTD
Feb 2010 – Dec 2010 Exxon Mobile, Shell -
Ng
*
Function in a Project Control Manager (PCM) role on large projects which
includes development of project control plans. *
Spearheaded project budget and time reconciliation
through CPM and schedule analysis to determine SPI and CPI
VOXX SOLUTIONS
Aug 2003 - Jan 2010 *
Ensure required resources and effective processes are in place to execute
the project control plans *
Power Plant Construction estimating,
scheduling and resource levelling to determine feasibility *Budgeting
and Cost Tracking for new and ongoing projects using Schedule
and Cost performance indexes BINT
AND
PRATHEL
Mar. 2002 – Feb 2003
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|